⚡ TaskFlow + New

Task Board

39 total tasks

Clear
Completed 17 Apr 2026
Collect Mazuri PC in town

Collect PC sent by Tsuma was in good shape

Req: Franciis Assigned: Zack
0
Completed 13 Mar 2026
Gedions KRA Fillinng Issues

HELP Gedions with KRA filing PC file configured correctly

Req: Gedion Assigned: Zack
0
Completed 13 Mar 2026
Gedions KRA Fillinng Issues

HELP Gedions with KRA filing PC file configured correctly

Req: Gedion Assigned: Zack
0
Completed 22 Apr 2026
Repair KRA and Etims PC at Express

Repaire PC with Steve remotely

0
Completed 22 Apr 2026
JONATHN PC maintenance Issue

LOTS OF POPUP emails not working

Req: JONATHAN
0
Completed 21 Apr 2026
Check internet speed @ plaza

Sufnet server speed is low due to maintaining at Sufnet Speed test 10 mbps

Req: Peris Assigned: Zack
0
Completed 20 Apr 2026
Internet at plaza

Problem with service provider keep fluctuating Speedtest is is 16mbps

Req: Steve Assigned: Zack
0
Completed 22 Apr 2026
Check PC at express Till 1

It randomly shutdown . It was replaced with Gedions PC Problem is the source of power it needs backup attached to Echo flow

Req: Steve,Steve Assigned: Zack
0
Completed 09 Apr 2026
Custom support to Gedions and Tresure

Support Gedions With Email and Tresure with PC issues

Req: Gedions Assigned: Zack
0
Completed 07 Apr 2026
IMART Wanzuu server was running slow Restarted

I restarted the server ,it improved performance

Req: Steve Assigned: Zack
0
Completed 07 Apr 2026
Repair Till 1 and Till2 IMART Express

Sms not working, screen flickering user support for both

Req: Dorothy, Juddy Assigned: Zack
0
Completed 07 Apr 2026
EXTENSION REPAIR CONNETED TO Ecoflow

Eco flow is overwhelmed by Fridge it burned one socket of the ECO flow

Req: MUL Assigned: Zack
0
TaskFlow

Designed & built with care by Zack Orengo  ·  2026

Laravel 11 · v1.0